This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
ft818:aio_box:v2_assembly [2020/10/04 21:35] f4ija |
ft818:aio_box:v2_assembly [2020/10/12 16:16] f4ija |
||
---|---|---|---|
Line 86: | Line 86: | ||
Solder 2 wires of about 20cm on the thermal switch and then install it on the heatsink. Use 3 M3 spacers and a standard head 8mm screw. | Solder 2 wires of about 20cm on the thermal switch and then install it on the heatsink. Use 3 M3 spacers and a standard head 8mm screw. | ||
+ | |||
+ | Also, before installing the DC converter, prepare the wiring and solder it (on both Raspberry and power supply side). | ||
Screw by the bottom the 16mm spacers and the printed part with the 4 countersunk head screws. Add a piece of foam just under the DC stepdown to avoid any contact with the aluminium plate. Adjust the thickness of the foam to have the DC stepdown well stuck. | Screw by the bottom the 16mm spacers and the printed part with the 4 countersunk head screws. Add a piece of foam just under the DC stepdown to avoid any contact with the aluminium plate. Adjust the thickness of the foam to have the DC stepdown well stuck. |